Boulder Armory, Boulder, Colorado
Abatement of Asbestos Contaminated Material (ACM) / Building Demolition
Project Value: $300K
Tasman was contracted to complete the removal of all external asbestos contaminated material texturing from two of the former Boulder Armory buildings, for a total abatement of 100,000 SF. Following asbestos abatement activities, Tasman was responsible for the demolition of the armory buildings. For a third building on site, scraping activities were conducted to remove lose ACM texture in an attempt to maintain historical building integrity. Abatement was performed under a full containment erected around the exterior of all buildings.